Date of completion August 2013
Project designer Envy MWS
  • 18 ft. tall decagon built in one night.
  • Full Graphics installed on each side.
  • Temporary tunnel constructed out of the side and removed 4 nights later
  • 3 Hidden door systems.
  • Side wall removed to allow for removal of large structure.